Sterling Annex, 2021 |
[Update August 2023: This school has now been demolished. Check out Sterling Annex DEMO DAY 1]
Well, we survived 2020, currently hobbling through 2021. I'm still here, and so is the Sterling Community Center Annex Building. Let's check it out.
No trucks or storage on the property this year. That couch has faded a lot.
It appears there has been no maintenance attempts since the last time I visited.
Close-up on the front doorway |
To the left side of the front doorway |
Flooded stairwell still flooded |
A turtle swimming in the flooded stairwell! |
Window in the auditorium still open |
More graffiti/vandalism |
Broken window |
The other side of the auditorium |
No trucks or storage on the property this year. That couch has faded a lot.
My favorite doorway. Ivy is taking over. |
The former playground area |
Sterling Annex, 2021 |